True/False
Indicate whether the sentence or statement is true
or false.
|
|
|
1.
|
A
linked object exists as a separate object in the destination file.
|
|
|
2.
|
The
file where you want to insert the object is called the source file.
|
|
|
3.
|
Office 2000 does not support OLE.
|
|
|
4.
|
When
an object is pasted, the menu and toolbar in the destination program change to those of the source
program when you edit the file.
|
|
|
5.
|
When
you make changes to an embedded object within the destination program, the changes are made to the
embedded object only; the original object in the source program is not affected.
|
|
|
6.
|
If
you update a linked object in the destination program, the changes will automatically be reflected in
the source program.
|
Multiple Choice
Identify the
letter of the choice that best completes the statement or answers the question.
|
|
|
7.
|
A
direct connection between the source and the destination program is called a(n) a. | link. | b. | copy. | c. | object.
| d. | source. | | |
|
|
|
8.
|
To
show nonprinting characters, press the ____ button on the Standard toolbar. a. | Nonprinting | b. | Save As | c. | Show/Hide | d. | Character | | |
|
|
|
9.
|
To
paste an object from the Clipboard to a destination file, choose ____ from the Edit
menu. a. | Paste
Special | b. | Paste | c. | Copy
| d. | Cut | | |
|
|
|
10.
|
To
copy an object to the Clipboard, click the ____ button on the Standard toolbar. a. | Cut
| b. | Copy
| c. | Save
As | d. | Paste | | |
|
|
|
Figure
18
|
|
|
11.
|
To
see the dialog box in Figure 1-8, a. | click the Paste Special Button on the Formatting
toolbar. | b. | click Edit, then click Paste Special. | c. | click Edit, then
click Paste. | d. | click the Paste Special button on the Standard
toolbar. | | |
|
|
|
Figure
110
|
|
|
12.
|
The
commands on the menu bar and the window surrounding the selected pie chart in Figure 1-10 suggest
that it has been a. | pasted into the
destination file. | b. | linked to the destination file. | c. | embedded in the
destination file. | d. | copied to the destination file. | | |
|
|
|
13.
|
To
select an embedded object, you must ____ it. a. | double-click | b. | click | c. | highlight | d. | copy | | |
|
|
|
14.
|
To
break a link between linked files, choose the ____ button in the Links dialog box. a. | Link | b. | Cut | c. | Update | d. | Break
Link | | |
|